1. Definitions

1.1 “Steele” means “Steele Build Pty Ltd” ABN 61 626 857 010, its successors and assigns, or any person acting on behalf of and with the authority of Steele Build Pty Ltd.

1.2 “Contract” means the written and signed agreement between Steele and the Client for the supply of Goods and Services.

1.3 “Client” means the person/s paying for the Goods or Services as specified in any Contract, invoice, document or order, and if there is more than one Client, it is a reference to each Client jointly and severally.

1.4 “Goods” means the articles, goods, material, or part thereof to be supplied under the Contract.

1.5 “Services” means the services to be performed under the Contract.

1.6 “Price” means the total amount of money payable for the Goods and/or Services as agreed between Steele and the Client in accordance with clause 4 below.

1.7 “GST” means Goods and Services Tax.

2. Acceptance

2.1The Client is taken to have exclusively accepted and is immediately bound, jointly and severally, by these terms and conditions if the Client engages the services of Steele.

2.2 These terms and conditions may only be amended with Steele’s written consent and shall prevail to the extent of any inconsistency with any other document or agreement between the Client and Steele.

2.3 The Client acknowledges and agrees that it is their responsibility to obtain any necessary approvals or permits from the local council or government for the Services. Steele shall not be liable for the Client’s failure to comply with this clause.

3. Change in Control

3.1 The Client shall give Steele no less than fourteen (14) days prior written notice of any proposed change of ownership of the Client and/or any other change in the Client’s details (including, but not limited to, changes in the Client’s name, address, contact phone or fax numbers, or business practice). The Client shall be liable for any loss incurred by Steele as a result of the Client’s failure to comply with this clause.

4. Price and Payment

4.1 The Price shall be either:

  • (a) in accordance with any Contract signed by Steele and the Client; or
  • (b) as indicated on any invoice provided by Steele to the Client.

4.2 Steele reserves the right to change the Price if a variation to Steele’s quotation is requested. Any variation from the plan of scheduled Services or specifications of the Goods (including, but not limited to, variations due to fluctuations in currency exchange rates or increases to Steele in the cost of taxes, levies, materials, and labour, or where additional services are required due to hidden or unidentifiable difficulties such as poor weather conditions, site access limitations, hard rock barriers below the surface, or the discovery of iron reinforcing rods in concrete, obscured building defects, safety considerations, machinery availability, change in design or specifications, or prerequisite work by a third party not being completed) will be charged on the basis of the Contract and shown as variations on the invoice.

4.3 At Steele’s sole discretion, a non-refundable deposit may be required.

4.4 The Price will be payable by the Client on the date/s determined by Steele, which may be:

  • (a) thirty (30) days following the date of any invoice given to the Client by Steele; or
  • (b) the date for payment specified in the Contract.

4.5 Unless otherwise stated, the Price does not include GST. The Client must pay GST, without deduction or set-off of any other amounts, at the same time and on the same basis as the Client pays the Price. Additionally, the Client must pay any other applicable taxes and duties except where they are expressly included in the Price.

5. Risk

5.1 Risk of damage to or loss of the Goods passes to the Client upon delivery.

5.2 If any of the Goods are damaged or destroyed following delivery but before ownership passes to the Client, Steele is entitled to receive all insurance proceeds payable for the Goods. The production of these terms and conditions by Steele is sufficient evidence of Steele’s rights to receive the insurance proceeds without the need for any further inquiries.

5.3 Steele reserves the right to refuse entry to the site to undertake the Services if Steele believes the site to be unsafe. The Client agrees that it is their responsibility to ensure the site is made safe before Steele will enter. Steele shall not be liable for any delays caused, loss, damages, or costs resulting from an unsafe site.

5.4 Steele shall not be responsible for any damage to the Goods or delays in delivery caused by outside agents. If the Client requests Steele to repair such damage, Steele reserves the right to charge the Client for any costs incurred in rectifying the damage.

6. Client’s Responsibilities

6.1 It is the Client’s responsibility to:

  • (a) ensure all areas are clean and clear to enable scheduled work to be completed according to the schedule;
  • (b) remove all fragile items such as glassware, crockery, pot plants, furniture, and ornaments. Breakages and damages are the Client’s responsibility. While all care is taken, Steele accepts no responsibility in this regard;
  • (c) provide adequate dust sheets to protect the Client’s furniture and décor;
  • (d) supply power within eight (8) metres of the project; and
  • (e) make the premises available on the agreed date and time. If installation is interrupted by the Client’s failure to adhere to the agreed schedule, any additional costs will be invoiced as extras.

6.2 The Client acknowledges that if asbestos or any other toxic substances are discovered at the worksite, it is their responsibility to ensure their safe removal. The Client agrees to indemnify Steele against any costs incurred as a consequence of such a discovery. Steele will not handle asbestos removal under any circumstances.

7. Specifications

7.1. The Client acknowledges that:

  • (a) All descriptive specifications, illustrations, drawings, data, dimensions, and weights stated in Steele’s fact sheets, price lists, or advertising material are approximate only and are given by way of identification only. The Client shall not be entitled to rely on such information, and any use of such does not constitute a sale by description and does not form part of the Contract, unless expressly stated as such in writing by Steele.
  • (b) While Steele may have provided information or figures to the Client regarding the performance of the Goods, the Client acknowledges that Steele has given these in good faith and based on prescribed estimates, which may be inaccurate due to factors out of Steele’s control (including, but not limited to, the location (geographical or otherwise) of the Goods).
  • (c) Some buildings may not have the optimum orientation for the installation of the Goods and/or Services or components, and therefore the Client understands and accepts that the Goods’ performance may be compromised in such situations. Notwithstanding this, Steele will use its best endeavours to install and position the Goods to maximise performance.

7.2. The Client shall be responsible for ensuring that the Goods ordered are suitable for their intended use.